Oath Taking Ceremony
morong-simbahan
St. Jerome Parish Church
Seal of Good Local Governance (SGLG) Awardee 2022

Municipal Engineering Office


ISSUANCE OF BUILDING PERMIT
MUNICIPAL ENGINEERING OFFICE
Monday – Friday (8:00 am – 5:00 pm)


REQUIREMENTS:

1. Properly filled-up application forms duly signed and sealed by engineers concerned.

  • Application for Building Permit (5 copies)
  • Architectural / Civil Permit form (5 copies)
  • Electrical Permit form (5 copies)
  • Sanitary / Plumbing form (5 copies)
  • Mechanical Permit form (5 copies)
  • Electronic Permit form (5 copies)

2. Five (5) complete sets of detailed plans duly signed and sealed by engineers concerned.
3. Accessory requirements:

  • Structural design analysis for construction of two (2) or more storey building.
  • Boring and load test, seismic analysis, compressive strength for concrete and strength for re-bars for building of three (3) or more storey.
  • Photocopy of Proof of Property (5 copies)
    • Transfer Certificate of Title (TCT)
    • Tax Declaration of property lot
    • Current tax receipt
    • Contract of sale / lease, deed of absolute sale, affidavit of consent of lot – owner in case the applicant is not registered owner of property
  • Bill of materials and specification signed and sealed.
  • Photocopy of PRC license and PTR number of design professionals.
  • Clearances from concerned agencies.
  • Locational and zoning clearance
  • Fire clearance
  • Barangay clearance
  • Other clearances from various authorities exercising and enforcing regulatory functions affecting building / structure.

ISSUANCE OF CERTIFICATE OF ANNUAL INSPECTION FOR BUSINESS PERMIT
Municipal Engineering Office
Monday – Friday (8:00am – 5:00pm)

Requirements:
1. Inspection report.

Procedure:

No. Applicant/s Service Provider Duration Concern Person Fees Form
1. Present all the required documents Review, Inspect & assess the required documents 1 hour MEO Staff None
2. Payment to the cashier Process payment and Issue Official Receipt 3 min. MEO Staff As per issued order of payment.
3. Sign Logbook for release. Grant / Issue Certificate 1min. MEO Staff None

ISSUANCE OF CERTIFICATE OF OCCUPANCY PERMIT
Municipal Engineering Office
Monday – Friday (8:00am – 5:00pm)

Requirements:
1. Properly filled – up of completion forms duly signed by engineer’s concerned.

Procedure:

No. Applicant/s Service Provider Duration Concern Person Fees Form
1. Present all the required documents Review, Inspect & assess the required documents 1 hour MEO Staff None  Completion
2. Payment to the cashier Process payment and Issue Official Receipt 3 min. Cashier/MTO Staff As per issued order of payment.
3. Sign Logbook for release. Grant / Issue Certificate 1min. MEO Staff None

PREPARATION OF PLANS AND PROGRAMS OF WORK
Municipal Engineering Office
Monday – Friday (8:00am – 5:00pm)

Requirements:
1. Request letter indicating the service needed.

Procedure:

No. Applicant/s Service Provider Duration Concern Person
1. Submit letter request to the charge Person-in-charge receives and records the letter request in a logbook and forwards

the same to the MEO for evaluation and notation. M.E.O evaluates the letter and instruct oversee request.

1 minute

3 minutes

MEO Staff Person-in

Engr. Bayani G. Sunga to handle

2. Confirm schedule of site Person-in-charge schedules site visitation. 1 minute Engr. Bayani G, Sunga inspection.
3. Accompany MEO personnel inspection and states his preferences. Person-in-charge conducts site visitation together with requesting party and notes down all requests. 1 to 2 hours ME / MEO Staff During site
4. Wait for the completion of plan of work. Person-in-charge prepares plan and Program of work – scope and bill of materials. Minimum of 1hr. to maximum of two weeks depending of extent of project.  Engr. Bayani G. Sunga and program
5. Pick up prepared plan and program processing. Person-in-charge release plan and program of work. 5 minutes MEO Staff of work for

PREPARATION OF PLANS FOR REPAIR
Municipal Engineering Office
Monday – Friday (8:00am – 5:00pm)

Requirements:
1. Request letter indicating the service needed.

Procedure:

No. Applicant/s Service Provider Duration Concern Person
1. Submit letter request to the Person-in-charge receives and records the letter request in a logbook and forwards

the same to the MEO for evaluation and notation. M.E.O evaluates the letter and instruct oversee request.

1 minute

3 minutes

MEO Staff Person-in

Engr. Bayani G. Sunga

2. Confirm schedule of site Person-in-charge schedules site visitation. 1 minute MEO Staff inspection.
3. Accompany MEO personnel inspection and states his preferences. Person-in-charge conducts site visitation together with requesting party and notes down all requests. 1 to 2 hours ME / MEO Staff During site
4. Wait for the approval of plan Person-in-charge prepares plan and Program of work – scope and bill of materials. Minimum of 1hr. to maximum of two weeks depending of extent of project. Engr. Bayani G. Sunga
Philippine Standard Time
23rd December 2024 Monday
lgpmsphilgemspolice-portaldeparment-of-health


NOW LOADING